Industrial Pipe System
For A Process Plant

ArcForge pipe welder sealing a process line joint with blue arc light

Overview

A chemical processor needed 1,200 feet of new process and steam piping tied into a live plant — 140 welded joints across carbon and stainless, installed during a 12-day turnaround window. First hydrotest passed with zero leaks.

The Challenge

Half the tie-ins touched operating lines, so every hot tap and weld had to be sequenced around production with no room for a do-over. Stainless roots demanded full purge protection in tight overhead positions.

Our Approach

We pre-spooled everything possible in our shop, numbered every joint on the isometrics, and staged two 6G crews in sequence — fit, purge, root, fill. Each weld was mapped to its welder and purging log before the next joint started.

Welder running a vertical bead on an installed pipe riser
Spool preparation on the bench before the plant installation

140

Joints welded

0

Leaks at hydrotest

12 days

Turnaround met